Projects

Project: Conversion of Diesel Generator Units (DGU) No. 6&7 for operation on Heavy Fuel Oil
Capacity: 13 MWel Diesel power generation capacity
Location: Malé, Republic of Maldives
Time: September 2003 to August 2005
Client: STELCO State Electric Company Ltd., Malé
Services: Consultancy services for preparation of tender documents including basic design, pre-qualification of bidders, evaluation of tenders, assistance during contract negotiations, design approval, site management and supervision, project as well as claim management
Details: Conversion of existing DGU 6&7 (6,5 MW each) including all required auxiliary systems for operation on HFO, installation of hot water heat recovery system from HT cooling water circuit for tank heating and trace heating, suitable HFO unloading station with transfer pipeline, fuel treatment building and additional LV power supply via a new 11/0.4kV 630 kVA substation including ~ 2000 m MV and LV underground cable.

Effects of Tsunami (26. Dec. 2004) on HFO Conversion works
Fuel pipe rack, Fuel Treatment House, HFO service & storage tank

back