Projects

Project: IPP Igdir
550 MW Natural Gas fired Combined Cycle Power Plant
Location: Igdir, Turkey
Time: 1998
Client: Consortium AKFEN MARATHON PAR
Services: Preparation of feasibility study and bid documents for IPP energy supply to TEAS (local utility) interconnected HV Network
Details: OLP was responsible for the conceptual design for the entire electro-mechanical generation process, civil works, required substation and interconnection to HV net.

The study included the following services:
  • site investigation
  • conceptual & gas supply
  • financial & economic analysis of different options
  • preparation of bid documents

back