Project: | IPP – Igdir 550 MW Natural Gas fired Combined Cycle Power Plant |
Location: | Igdir, Turkey |
Time: | 1998 |
Client: | Consortium AKFEN MARATHON PAR |
Services: | Preparation of feasibility study and bid documents for IPP energy supply to TEAS (local utility) interconnected HV Network |
Details: | OLP was responsible for the conceptual design for the entire electro-mechanical
generation process, civil works, required substation and interconnection to HV net. The study included the following services:
|